Trench backfill calculator

Thorough knowledge or planning, layout, and execution of excavation, backfill, and underground piping/utilities. Competency in working with deep excavations requiring the use of trench boxes and other support systems. Experience in mass excavation, demolition, site work, and utility line work. ubuntu mount smb share username password Dig ditches or trenches, backfill excavations, and compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, and rakes. Erect and disassemble scaffolding, shoring, braces, traffic barricades, ramps and other temporary structures.It is important to mention that it is possible to define excavation zones by depth (i.e. 0-2 m, 2-4 m etc.). Program will calculate total excavation and excavations for each zone. In addition, the ...If you would like to talk to someone about your aggregate requirements please call our sales offices: Eastern Area (Suffolk, Essex and Norfolk), Tel: 01473 811900. Email: … iron horsemen allies OSHA is focusing on reducing trenching and excavation hazards. Trench collapses, or cave-ins, pose the greatest risk to workers' lives. To prevent cave-ins: SLOPE or bench trench walls. SHORE trench walls with supports, or. SHIELD trench walls with trench boxes. Employers should also ensure there is a safe way to enter and exit the trench. how to beam roblox accounts on mobile Calculation of the volume of the trench. Free online service. Calculation of the volume of the trench drawing scale 1: 11.52345678910 Specify dimensions in metres The length of the trench L Width A Width B Depth H Specify the value of excavation work Digging (for 1 cubic meter) Removal of soil (for 1 cubic meter)Multiply the result by the average depth of the trench. 3. Subtract the volume of the pool area from the volume of the gravel area. The result is the volume of gravel required for the trench....The calculator above can be used to estimate the amount of gravel necessary given a number of factors. Note that the price estimate provided by the calculator is solely an estimate based on the cost of materials. Any other costs associated with a project (labor, delivery of materials, etc.) are not included in the estimate. vintage weld wheelsGeostatic Backfill Load on Concrete Pipes Calculation - Narrow Trench. The backfill load (W c) created by narrow trench conditions can be calculated using the below equation. This equation combines the downward forces of the soil column and the upward forces of the friction between the soil column and the trench walls. hawaii snap application status The calculation method described below applies for underground pipes without ... necessary to dig a trench that is 250 mm deeper and then backfill it with ...Where, ft 3 is a total volume (cubic feet) and m 3 is a cubic meter.; length, breadth and depth in feet/inch. Note: 1 m 3 = 35.3147 ft 3Trench width may be reduced (see 206-Structure Backfill (FlowFill) dated June 26, 1997). ... The method used to calculate these rates is as follows:.This calculator will calculate the volume of excavated material using the length and width of the excavation in feet and the excavation depth from an average of four points. It will calculate the volume increase of the material using the …Duct Bank Calculator Need to install a duct bank and want to get the particulars? Simply enter in the information below and Construction Monkey will calculate the trench sizes, backfill, and excavation requirements. Enter Information Excavation Depth of Duct Bank: Depth Measured from Grade to: Length of Duct Bank: feet Minimum Width of Duct Bank:Trenching A trench is a type of excavation that is generally deeper than it is wide at the top. Image source: Bloomberg Environment Trenches are used in archeology, civil engineering, and military engineering for various purposes. In residential construction, they are excavated mainly to provide a base for buildings.Calculate Fill Dirt. Type in inches and feet of your project and calculate the estimated amount of Soil & Dirt in cubic yards, cubic feet and Tons, that your need for your project. The Density of Fill Dirt: 2,410 lb/yd³ or 1.21 t/yd³ or 0.8 yd³/t. Type in your numbers.For TYPE A soil and a trench depth of less than 12 feet for a trench open 24 hours or less, the steepest maximum allowable slope is 63 degrees from the horizontal. This translates to a 0.5H: 1V incline and is shown below. Maximum Allowable Slope Cut­back distance (H) = 0.5 x Depth (V) long island audit danbury lawsuit Jan 7, 2023 · The first step to backfilling a trench is to remove any large rocks and other debris from the bottom of the trench. This will help make the process of filling the trench easier and will prevent any damage to the surrounding area. Once the debris has been removed, the next step is to add a layer of gravel to the bottom of the trench. Determine the volume of the trench by using the formula: Volume = Width x Length x Depth. As an example, a trench 12 feet long with an average width of 2.3 feet and an average depth of 5 feet has a volume of (12 x 2.3 x 5) cubic feet. How is earthwork excavation calculated? Volume = Sum * 100 (Area of Each block) = 4.6225 * 100 = 462.25 (Filling).How is backfill soil calculated? For example, find the cubic footage volume of a backfill area that is 8 feet wide, 6 feet deep and 50 feet long. The volume of a rectangular cubed shape is found by the formula v = l x w x d, where v represents volume, l is the length of the trench, w is the width and d is the depth. What is excavation and backfill?2017. 8. 30. ... Today, we're going to look at Calculating Trench Volume in Cubic Feet. Watch the video below and learn how this type of Distribution math ... 15x6 00 6 tire tube The cross-sectional area of the trench is (5+15)/2*5, or the average trench width of 10 feet * 5 feet deep = 50 square feet. If the trench is 100 feet long, and the ends of the trench excavation are not also sloped, then the volume is 50 * 100 = 5000 cubic feet, or 185 cubic yards.How do you calculate trench excavation? The cross-sectional area of the trench is (5+15)/2*5, or the average trench width of 10 feet * 5 feet deep = 50 square feet. If the trench is 100 feet long, and the ends of the trench excavation are not also sloped, then the volume is 50 * 100 = 5000 cubic feet, or 185 cubic yards. how many brothers does dd osama have Bureau of ReclamationCalculate the volume (in Cubic Feet - L x W x D) of the area for which you need fill material. If the material is ordered by the yard, divide the CF by 27. If the material is ordered by the ton, identify the weight per CF of the material and multiply it out. Next, divide by 2000 to convert the weight to tons. You man need to add a percentage to ... blackstone griddle hood obituaries luton. robert mealy funeral home obituaries. which tool would you use to make header 1 look like header 2; male rock singer with white hairAggregate Calculator | Calculate how much sand, slate, or gravel you need for your ... binding hardcore, Oversite fill, covering sub-base, and backfill. sgt bryan fahey ct PIPE AND STRUCTURE BACKFILL BACKFILL LIMITS The trench for the pipe is required to be backfilled as indicated on the plans or Standard Sheets with structural backfill or coarse aggregate (Section 211.02) or flowable backfill (Section 213.02). When flowable backfill is used, the Contractor is required to submit a mix design andWhen it comes to backfill, the best material is a combination of gravel and native soil. By combination, I don't mean mixture. But, the retaining wall must be backfilled to a thickness of at least 15 cm by gravel of nominal size not exceeding 10 mm. Then behind that, a layer of native soil as much as the need be.Productivity Tracking. As a subcontractor, labor productivity has the biggest impact to a project's bottom line. crewHD helps mitigate this labor risk by utilizing a streamlined process that puts your entire team (field and office) in the know with real-time project data, so everyone can work towards improving productivity to consistently be under budget, stay on schedule, make money, and have the happiest crews on the jobsite.Soil Compaction Handbook - Multiquip Inc 1955 nash rambler for sale Jun 01, 2021 · "Walk-behind trenchers are good for digging dirt for utility work like cable, telephones or pipes," he says. "They are designed to move soil so if the groundLand grading contractors charge anywhere from $40 to $180 an hour for labor. In addition to the hourly rates for labor, contractors charge by the cubic yard of dirt they'll need t bonita beach trailers for sale Geostatic Backfill Load on Concrete Pipes Calculation – Narrow Trench. The backfill load (W c) created by narrow trench conditions can be calculated using the below equation. This equation combines the downward forces of the soil …excavating trenches, constructing trench foundations, placing bedding, pipe zone material, and trench backfill. 101.1.01 PIPE ZONE. The pipe (main line and service lines) zone is defined as the full width of the trench from 6-inches below the bottom outside surface of the of the pipe to 12bell -inches above the top outside of the barrel of the ...• See Measuring Notes for Excavation & Backfill on P. 59 • These are part of the Standard Method of Measurement with regards to Excavation and Backfill. • Example items (see Measuring Notes, p. 59): - Excavations, backfill and fill material shall be measured in cubic yards or cubic meters "bank measure"The cross-sectional area of the trench is (5+15)/2*5, or the average trench width of 10 feet * 5 feet deep = 50 square feet. If the trench is 100 feet long, and the ends of the trench excavation are not also sloped, then the volume is 50 * 100 = 5000 cubic feet, or 185 cubic yards. tmnt fanfiction donnie angst Asphalt Calculator: Used for all Asphalt products Asphalt WMA-RAP (Warm Mix Recycled Asphalt) All-Weather Cold Patch Berm Mix Topeka Fines Porous Asphalt RAP (Recycled Asphalt Product) Base Rock Calculator (also trench backfill, sub-base or select fill) Base Rock Calculator Used for: Base Rock Drain Rock Screened Chips Sand Sub-base Fine AggregatesCost to Dig Trench - 2022 Cost Calculator (Customizable) Projects Maintain Install Materials My Lists Cost to Dig a Trench July 2022 For a basic project in zip code 47474 with 25 linear feet, the cost to Dig a Trench starts at $7.11 - $20.48 per linear foot. Actual costs will depend on job size, conditions, and options. Section 19 – Trench Excavation, Bedding and Backfill 19.2 10/15/07 Pipe Size (Inches) Minimum Trench Width (Inches) 12 OD+12 15 OD+13 18 OD+15 21 OD+16 24 OD+17 27 OD+18 30 OD+19 33 OD+20 36 OD+22 Based on Minimum Working Space If maximum trench widths at the top of the pipe are exceeded by any amount, the ContractorThe Trench Calculator allows you to quickly calculate trench, pipe, and bedding values. You can perform pipe-related take-off by defining the details of the trench (e.g., length, depth, width, hinge elevation, backslope, and swell factor), the pipe (diameter, elevation, and waste factor), and up to four beddings. hale center theater sandy The safety factor is the result of dividing the load bearing capacity of the installed pipe by the calculated backfill load on the pipe.Where, ft 3 is a total volume (cubic feet) and m 3 is a cubic meter.; length, breadth and depth in feet/inch. Note: 1 m 3 = 35.3147 ft 3Multiply your area figure by the depth of gravel that you wish to use, ensuring your measurement is also in feet. If your depth is in inches, divide it by 12 first. You now have a cubic feet volume figure. To convert to cubic yards, divide by 27. To work out the weight in tons, multiply your volume figure by the density of the gravel in tons/yd³.We will cover four main methods of trench backfilling: 1. Jetting. Also known as, “water jetting”, this practice uses pressurized water sprayed into the trench through the use of a long metal device. Note: Water dissipation decreases the trench volume, thus in the long term this method is best recommended for granular soil types. solingen germany knife history The basic cost to Backfill a Trench is $2.79 - $11.76 per linear foot in January 2023, but can vary significantly with site conditions and options. Get fair costs for your SPECIFIC …How do you calculate backfill? Backfill for Figure 3.1: Backfill volume = excavation volume – footing volume – wall volume. (Note that only the portion of the wall that is in the trench is deducted, so the height of wall in the trench is the average trench depth minus 2′-0” for the footing: 6′-0” – 2′-0” is 4′-0”) scene everskies layout Roadway Fill Volume Calculator Calculator Use Calculate (estimate) roadway or parking lot material fill requirements for construction or maintenance projects. Allows common road materials or custom entry so you can enter your own material density. If you need additional materials in the drop down menu you can contact us and make a request. how old is dd osama Step 1: Pick a Backfilling Method Before you get started, you'll want to determine which of the four common backfilling methods your team will use based on your backfill material. Compacting Compacting uses heavy machinery to reduce the volume of a mass of material. Soil is added in layers and becomes compacted before you add the next layer.After calculating all the upward and downward loads, the loads are used to check if the factor of safety is met. ... in swampy terrain increasing trench depths leads to an uncontrollable increase in trench width. Special backfill soil with higher density may as well be used in combination with an increase in burial depth to achieve the ...Backfill a Trench: national average cost. The total price for labor per linear foot is $4.57, coming in between $1.60 to $7.54. A typical 50 linear foot project costs $228.34, with a range of $79.89 to $376.79. Your actual price will depend on your location, job size, conditions and finish options you choose. cost to backfill a trench.excavating trenches, constructing trench foundations, placing bedding, pipe zone material, and trench backfill. 101.1.01 PIPE ZONE. The pipe (main line and service lines) zone is defined as the full width of the trench from 6-inches below the bottom outside surface of the of the pipe to 12bell -inches above the top outside of the barrel of the ...How do you calculate backfill volume? For example, find the cubic footage volume of a backfill area that is 8 feet wide, 6 feet deep and 50 feet long. The volume of a rectangular cubed shape is found by the formula v = l x w x d , where v represents volume, l is the length of the trench, w is the width and d is the depth. bmw x4 cigarette lighter fuse Excavation calculator will help you to calculate exactly how much amount of land/earth needs to be excavated for house or building construction. You can calculate the length, breadth and …Excavation calculator will help you to calculate exactly how much amount of land/earth needs to be excavated for house or building construction. You can calculate the length, breadth and …Trench excavation shall be made in open cutting unless tunnelling or heading is specified or approved by the Supervisor and shall be taken out as nearly as possible to exact dimensions and levels so that the minimum of infilling will afterwards be necessary.Using variable inputs provided I need formula to calculate volumes of materials going back in a trench including 'Haunching Material', 'Backfill Material' & Bedding Material required. These will vary depending on trench width, trench length, trench depth, pipe OD diameter and depth of Haunching Material.To access the pipe calculator, right click with your mouse and select Pipe Trench Calculator (or hold down the ALT key and press F8 on the keyboard). It is required that the user enters a drawing number for this trench calculation. The drawing number will be what the program uses to save the calculation under for future use. pastors conference 2022 texas Jan 15, 2023 · National Average cost to backfill a trench Calculator For your project in zip code 98102 with these options, the cost to backfill a trench starts at $1.67-$7.90 per linear foot. Your actual price will depend on job size, conditions, finish options you choose. Cost Calculator Zip Code Calculations are dependent on where you live Linear Feet bike beach cruiser • Lead (CL: 5.1) • Distances not exceeding 250 m shall be measured in units of 50 m. • Distance exceeding 250 m and not exceeding 500 m shall be measured as a separate item. • Leads beyond 500 m shall be measured in units of 500 m, • That is, there will be one item for lead exceeding 500 m and not exceeding 1 000 m, • Another item for lead exceeding 1000 m and not exceeding 1500 m ...This article assumes that you build a retaining wall following this method: First dig a trench that is twice as wide as the wall, as long as the finished wall, and 8 inches deep. Then fill the base of the trench with coarse gravel, and build the wall so that about 6 … horry county mugshots 2022 How is backfill soil calculated? For example, find the cubic footage volume of a backfill area that is 8 feet wide, 6 feet deep and 50 feet long. The volume of a rectangular cubed shape is found by the formula v = l x w x d, where v represents volume, l is the length of the trench, w is the width and d is the depth. What is excavation and backfill?How do you calculate trench excavation? Determine the volume of the trench by using the formula: Volume = Width x Length x Depth. As an example, a trench 12 feet long with an average width of 2.3 feet and an average depth of 5 feet has a volume of (12 x 2.3 x 5) cubic feet. What is a compacted volume? wood county police reportsSection 207—Excavation and Backfill for Minor Structures Section 208—Embankments Section 645—Repair of Galvanized Coatings Section 812—Backfill Materials ... fill, allowable pipe diameters and trench construction detail. For thermoplastic pipes see Ga. Std. 1030P for minimum cover, maximum fill, allowable pipe diameters and trenchThen its capacity considered is ( (1x10)/0.04125) = 242.4242 m 3 / day. That means, a hydraulic excavator can excavate 242.4242 m 3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000. Then the cost of 10m 3 of excavation can be calculated as: No. of days required for 10m 3 excavation = 10/242.4242 = 0.04125 days. mammoth overland trailer weight Calculator Use. Calculate cubic yards volume for landscape material, mulch, fill, gravel, cement or containers. Enter dimensions in US units (inches or feet) or metric units (centimeters or meters) to calculate the cubic yards, cubic feet and cubic meters. Also calculate the cost of materials when you enter the price per cubic foot, price per cubic yard or price per cubic meter.How do you calculate backfill? For example, find the cubic footage volume of a backfill area that is 8 feet wide, 6 feet deep and 50 feet long. The volume of a rectangular cubed shape is found by the formula v = l x w x d, where v represents volume, l is the length of the trench, w is the width and d is the depth. mega jp prediction tips If you have dug a trench to repair a pipe, install outdoor lighting or for some other project, you must eventually refill it with soil. Although most people simply shovel the dirt back into the trench, this often results in low spots where ...Trench stands for an extended excavation that is separated from pits or basements. A footing is a good instance of the trench. In order to find out the volume of excavation for a simple footing, the following formula is used :- CL x W x D = Cu.Ft. of Excavation If you want to change to cubic yards, divide the results by 27Calculate (estimate) roadway or parking lot material fill requirements for construction or maintenance projects. Allows common road materials or custom entry so you can enter your …The cross-sectional area of the trench is (5+15)/2*5, or the average trench width of 10 feet * 5 feet deep = 50 square feet. If the trench is 100 feet long, and the ends of the trench excavation are not also sloped, then the volume is 50 * 100 = 5000 cubic feet, or 185 cubic yards. dcs vr blurry 1,201 Posts. #3 · Apr 19, 2014. I don't charge the customer a "per foot price", just a flat rate price with my own per foot prices built in. 2' deep trench is about $10/foot with a $500 min. If there are lots of trees or I know the area is more rocky, the price is closer to $15/ft. 2.Duct Bank Calculator. Need to install a duct bank and want to get the particulars? Simply enter in the information below and Construction Monkey will calculate the trench sizes, backfill, and excavation requirements.PIPE AND STRUCTURE BACKFILL BACKFILL LIMITS The trench for the pipe is required to be backfilled as indicated on the plans or Standard Sheets with structural backfill or coarse aggregate (Section 211.02) or flowable backfill (Section 213.02). When flowable backfill is used, the Contractor is required to submit a mix design and puppies for sale springfield • Lead (CL: 5.1) • Distances not exceeding 250 m shall be measured in units of 50 m. • Distance exceeding 250 m and not exceeding 500 m shall be measured as a separate item. • Leads beyond 500 m shall be measured in units of 500 m, • That is, there will be one item for lead exceeding 500 m and not exceeding 1 000 m, • Another item for lead exceeding 1000 m and not exceeding 1500 m ...Trench Calculator will help you estimate the volume of material that needs to be removed from the trench in a rectangular or sloped shape.To calculate the amount of backfill for the trench first know your measurements of your trench type. Measure and record the length. After doing so, measure and record the width and the depth from different points in equally space interval until the end. After measuring, calculate the average width and depth from the measurements taken. letrs unit 2 The volume of a rectangular cubed shape is found by the formula v = l x w x d, where v represents volume, l is the length of the trench, w is the width and d is the depth. Applying the numbers to this formula (8x 50x 6) the cubic footage of … asian shemale pics Jan 7, 2023 · The first step to backfilling a trench is to remove any large rocks and other debris from the bottom of the trench. This will help make the process of filling the trench easier and will prevent any damage to the surrounding area. Once the debris has been removed, the next step is to add a layer of gravel to the bottom of the trench. This article assumes that you build a retaining wall following this method: First dig a trench that is twice as wide as the wall, as long as the finished wall, and 8 inches deep. Then fill the base of the trench with coarse gravel, and build the wall so that about 6 …When it comes to backfill, the best material is a combination of gravel and native soil. By combination, I don't mean mixture. But, the retaining wall must be backfilled to a thickness of at least 15 cm by gravel of nominal size not exceeding 10 mm. Then behind that, a layer of native soil as much as the need be.Nov 22, 2022 · Our retaining wall calculator also allows you to calculate retaining wall costs. To do so, all you need to do is: Input the price of a single retaining wall block (and that of a cap block, if you chose that option at the top of the calculator) Input the price of gravel per unit weight - any unit will do. 1 Jan 2023 ... 1.1.12 Stress level and expansion calculation ... The LOGSTOR Calculator also gives you the ... The trench can be backfilled continu-. abortion at 5 weeks mumsnet 13 Jul 2021 ... With this advanced Excavation Cost Calculator, you can now estimate the cost and volume of excavated soil on the fly. roth ira vanguard Cost to Dig Trench - 2022 Cost Calculator (Customizable) Projects Maintain Install Materials My Lists Cost to Dig a Trench July 2022 For a basic project in zip code 47474 with 25 linear feet, the cost to Dig a Trench starts at $7.11 - $20.48 per linear foot. Actual costs will depend on job size, conditions, and options.1.3.2 Bedding and backfill materials Materials for duct bedding and backfill, including their compaction requirements, shall be as shown on the Drawings. For common trenches accommodating wet (drainage and water supply) services and dry services, the bedding and backfill specified shall be provided for the portion of the trenchExcavation Cost Definition. Use our excavation cost calculator to instantly calculator how much an excavation job will cost. Enter the length, width, and depth of the area that needs to be excavated and the cost per yard and our calculator will return the … 1988 honda 250r for sale craigslist Where, ft 3 is a total volume (cubic feet) and m 3 is a cubic meter.; length, breadth and depth in feet/inch. Note: 1 m 3 = 35.3147 ft 3Welcome to Pipe Material Selection Software Version 1.1 To begin drag the Pipe Selection Template Excel .xls or .xlsx from your desktop to the drop zone below. If you do not have the Pipe_Selection_Template.xlsx file, you can download it from the link below.Calculate Fill Dirt | Cubic Yard (or Feet) to Tons Home Calculator Calculate Fill Dirt Change product How much Soil & Dirt do you need? - get the answer here! Select product to begin calculating amount 1. Select product Base Material Compaction & Bases Decorative Stone Decorative Stones Drainage Gravel Driveway Gravel Driveway GravelTrench Calculator - Trench Tab The following steps walk through using the Trench Calculator to take-off excavation volume. Step by Step — Trench Calculator - Trench Open the Training Job and from the Estimate tab, select Cost Breakdown Structure. Create a new cost item from the bottom row of your CBS and call it 24" Pipe. highland cattle auction results This calculator will calculate the volume of excavated material using the length and width of the excavation in feet and the excavation depth from an average of four points. It will calculate the volume increase of the material using the …When trench backfill is used the lifts shall not exceed 8 inches (200mm) in depth, loose measurements, and each lift shall be compacted to 85 percent of standard lab density by mechanical means. ____ Method 2 - The material shall be deposited in uniform layers not exceeding 12 inches (300 mm) thick, loose measure and each layer shall be eitherCalculator Use : This excavation calculator is extremely easy to use. Simply fill in the length, width, and depth of the excavated area to estimate the volume of excavated soil. Please select the respected unit of measurement in which you measured the dimensions of the excavated area before filling out the details.How is backfill soil calculated? For example, find the cubic footage volume of a backfill area that is 8 feet wide, 6 feet deep and 50 feet long. The volume of a rectangular cubed shape is found by the formula v = l x w x d, where v represents volume, l is the length of the trench, w is the width and d is the depth. What is excavation and backfill? craigslist farm and garden for sale by owner wisconsin Trenwa is the original manufacturer of precast concrete trench is the original manufacturer of precast concrete trenchAug 25, 2022 · How is backfill soil calculated? For example, find the cubic footage volume of a backfill area that is 8 feet wide, 6 feet deep and 50 feet long. The volume of a rectangular cubed shape is found by the formula v = l x w x d, where v represents volume, l is the length of the trench, w is the width and d is the depth. What is excavation and backfill? black and tan german shepherd puppies backfilling a concrete culvert, pipe, structural plate pipe, pipe-arch, or arch. However, the backfill material should always be identified as structure backfill. If coarse aggregate is used, the ends and top of the trench are to be capped with geotextile as shown on the INDOT Standard Drawings. The geotextile is not a separate pay item.This video will explain the process for calculating the volume of material that will need to be carted off site when digging an excavation for a foundation o... alpha hawks x omega reader nesting How do you calculate trenches? Calculate the volume of the trench by using this formula: Volume = Width x Length x Depth. As an example, a trench 12 feet long with an …Our dirt calculator can also help you with that – all you have to do is enter the topsoil price (per unit of mass, such as tonne, or per unit of volume, for example, cubic yard). The calculator will then display the total cost of the soil you need. Dirt calculator – how to estimate garden soil quantity? Let's deal with a real-life situation.Trench stands for an extended excavation that is separated from pits or basements. A footing is a good instance of the trench. In order to find out the volume of excavation for a simple footing, the following formula is used :- CL x W x D = Cu.Ft. of Excavation If you want to change to cubic yards, divide the results by 27To calculate cubic yards we use the formula: Cubic yards = Length (ft) x Width (ft) x Depth (ft) ÷ 27. Measure the length, width and depth of your area and then multiply the figures together to calculate a result in cubic feet. Dividing the result by 27 will give you a total in cubic yards. Cubic yards = Length (ft) x Width (ft) x Depth (ft) ÷ 27 black owned nail salon near me